For Wu Hao and the others, what they welcome is not only the quietly coming spring, but also good news. That is, the design plan of Haoyu Technology's Linghu new headquarters park has finally passed the review of relevant departments and is truly confirmed.

After several rounds of revisions to the entire design scheme, the final scheme was finally determined. The entire park has a total of 2,700 mu, of which the construction area has increased from the originally designed 830,000 square meters to 950,000 square meters.

The general design scheme of the initial design remains unchanged, but some details have been re-optimized. For example, the height and area of ​​the seven main buildings in the middle have been added as a whole, and the surrounding 28 auxiliary buildings have also had detailed design plans.

Then there is the planning of the entire park. The project design team also invited experts in this field to participate, so it can be said that it has been built into a park-like park.

Once the entire design plan was announced, it received extra attention from the outside world. Of course, praise and criticism are equally divided. Some praised the park for its beauty, science fiction and grandeur, while others criticized them for their blind arrogance and pleasure-seeking pursuit.

For Wu Hao and the others, these criticisms have no effect, and their most important job now is to seize the time to establish the final project contractor. Such a huge project is too short for the three-year construction period he set up. Therefore, it is necessary to ensure that the project starts as soon as possible, so as not to delay the follow-up work.

For their project, many giants in the construction industry at home and abroad are very interested, and a total of hundreds of companies have contacted them directly or indirectly, asking for relevant information and so on.

After the subsequent contact and communication and the basic determination of the design plan, many interested companies also withdrew one after another, leaving only some relatively powerful companies.

Among them are domestic and international famous construction contractors. But now everyone in the world knows that our country's infrastructure capacity is several positions ahead of other international contractors, and this project is located in China. Therefore, although there are international contractors in this bidding project, the main competition is still a few infrastructure giants with national signs.

After a careful screening, a total of 17 construction contractors entered the final bidding process.

Being able to enter the bidding process means that these construction contractors themselves have very strong strength, and there have been many successful excellent construction cases. And the relevant construction plan submitted was approved by Wu Hao and the relevant expert groups.

So now the seventeen companies are competing in the bidding meeting,

In addition to the overall construction period, there is also a quotation.

Among them, there are three companies that everyone is optimistic about, and the most famous and famous one should be China Construction. There is no need to question the strength of this company, and the construction plan and related planning materials are also well prepared. Even in order to win this project, China State Construction Engineering Co., Ltd. set up a team of experts to provide very targeted research solutions on the relevant construction plan, construction process, construction period, and quality assurance.

The construction plan they proposed to complete the overall construction of the seven main buildings of the center within 16 months, complete the construction of all the building facilities in the park within 23 months, and complete the delivery within 32 months can be said to have won the general approval of Wu Hao and the others. approval.

As for the quotation for the overall project, they initially gave a huge quotation of 11.15 billion. To be honest, this price is still a bit high, but compared to the construction prices of other giant corporate headquarters in the world, it is still relatively cheap.

The second company is also China Railway Construction, which competes fiercely with China Construction. This construction giant also has a long history, and also has strong strength and brilliant achievements. The predecessor of this company itself comes from the engineering unit of the Railway Corps. It can be said that the tenacity and hard work of the generals have been passed down to this day and have been carried forward.

At that time, in order to realize the modernization of the army, for the overall situation of the goal of a million-dollar disarmament. After receiving the order, all the officers and soldiers of the Railway Engineering Corps resolutely took off their military uniforms and devoted themselves to the construction of social infrastructure.

Being forced to change jobs and return to the place did not extinguish the flame in their hearts, but it became more vigorous. It took only a few years for officers and soldiers, no, it should be said that China Railway Construction Corporation stood up with a brand new look, and undertook a series of major projects.

They propose to complete the overall construction of the seven main buildings of the center within 17 months, complete the construction of all the building facilities in the park within 25 months, and complete the construction plan for delivery within 33 months. The total report is 9.75 billion yuan, which is a full billion lower than China Construction.

The third company comes from China State Construction Engineering Corporation Limited. Although this company is not as old as the previous two, it is also a domestic and international construction giant.

Its predecessor, China State Construction Engineering Corporation, was established in 1982 and is a key state-owned enterprise. With housing construction contracting, international project contracting, real estate development, infrastructure construction and municipal survey and design as its core businesses, it has grown and grown to become a leader in China's construction industry and real estate companies and the largest international contractor.

It is a state-owned enterprise that does not occupy a large amount of national funds, resources and patents, and has developed and grown by engaging in a completely competitive industry. It is also the only construction enterprise in China that has three special qualifications.

Compared with the previous two traditional construction companies, this China State Construction Engineering Corporation is younger and full of passion, and has great ideas in many projects, especially major projects. Some innovative construction techniques and construction schemes have also reached the international leading level.

But this time, they brought a brand new construction plan. According to their plan, the overall construction of the seven main buildings of the center will be completed in the most extreme fourteen months. It takes 20 months to complete the construction of all the building facilities in the park, and 32 months to complete the construction plan for the overall delivery. The total report is 10.3 billion yuan, which is lower than that of China Construction, and higher than that of China Railway Construction.

The construction time of several companies is actually similar, but the construction plan and technology and the order of emphasis are different.

To be honest, they couldn't decide which company to choose Wu Hao for a while. Fortunately, such a major engineering project cannot be determined immediately. And this is just their preliminary plan. Wu Hao and the others still need to communicate and discuss with the bidding teams of these companies, and come up with a final bidding plan.

Shukeju reading website:

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like