Refurbishment: Turning Waste into Treasure

Chapter 183 Compression of construction time [5 more]

"Super high-rise... Our preliminary plan is to use the R&D center, build a research institute, and a series of laboratories!"

Sun Xiaoshi had already considered the overall planning, and reported truthfully: "Our initial plan is to reserve at least 100 meters and more than 30 floors for the R&D center floor. 35

"This is pretty good!

Xu Fan nodded, agreeing with this plan, and never took his eyes off the big screen. Sun Xiaoshi and the others were also useful. They not only produced 3D renderings, but also produced a short film, which will be played continuously: " Alas... stop the playback first, this is the rendering of the construction, right?""

"Yes!" Sun Xiaoshi tapped the space bar of the computer and paused the playback of the short film.

"This is the character looking down, or half of the building!"

Xu Fan saw it clearly and had a deeper understanding of the building as a whole, and it was because of this that he seemed to remember something: "It feels a bit like the central building over there.

"Yes!

Sun Xiaoshi did not deny it, but admitted it generously: "24 To be honest, at the beginning of the design of our building, some sources of inspiration were based on the 'dragon' shape, which is similar to that of the magic capital. The same elements of the central building!

"On the whole, there are more or less references to some of the designs of the Magic City Center Building, including their wind tunnel design, etc. After all, Shennan City is also an area with frequent typhoons, and this factor needs to be considered. .""

"The difference is that there will be fewer typhoons on the Modu side than here, so during the design, we made some enhancements in the wind tunnel and other aspects to raise the building's wind resistance level by a step. ."

Sun Xiaoshi explained a lot. The design of a skyscraper is not that simple. There are too many factors to consider, not only the present, but also the future, as well as the climatic conditions of some regions, and then to itself. geological conditions, etc.

Incredibly complicated!

This is probably the real reason why many architectural design firms charge so much for the design scheme. After all, a complete design scheme must take all factors into consideration, and at the same time integrate the owner's ideas into the in.

There are complexities and difficulties here. It can be seen that the design is generally good, and it is strange that you don't charge money in death.

"Magic City Center Building gives people a feeling of spinning, twisting and rising from the ground. We don't have it here. There are some other details, which are also different. If I didn't see this picture, I couldn't compare it with They are connected."

Xu Fan smiled lightly and didn't care, and he didn't ask to be different: "Let's do it like this, I don't know how many people in the world imitate those high-rise buildings of famous buildings. Imitation.

"The residential area should be planned at about 480 meters, 300 meters is a bit low, and it should also be combined with the future office area of ​​our group. In my vision, it will be planned to be an office area from the ground to 400 meters above. 99

"Then going up, even if you build a hotel, it also needs to occupy a lot of floors, um... This hotel needs to pay special attention to setting aside a dedicated channel, the one that goes straight, don't go with the group's office elevator, And the elevators to the higher floors are combined and independent, and it is not easy to cause confusion!"

Xu Fan's thinking is a bit complicated, and he can only say whatever comes to his mind.

"In the elevator planning, we have made several plans. If there are no accidents, there will be more than 30 elevators in the whole building in the future, including the R&D center floor from the basement to the top floor, etc.! 35

Sun Xiaoshi pressed the space bar of the computer again, let the short video play for a few seconds, and paused again: "Boss... This is our initial idea for the underground floor, except for the underground -1 to -3 floors are parking lots, -3 to -8 floors, which will be built into a transshipment cargo yard, which belongs to the inner closed space floor."5

"Well, you guys are very comprehensive. In the future, a lot of things will be in and out of the group building, and they need to be kept secret. It's a good plan in the basement!"

Xu Fan nodded in agreement, robots are more professional, and he does not intervene when it comes to professionalism: "The lighting of the building needs to be specially reserved. After all, it is a skyscraper, so how can there not be a light show. 35

"Well... By the way, regarding the curtain wall glass, is there any advanced technology at present, that is, the dust resistance level is higher, you must know that such a curtain wall glass is stained with dust, it is not an easy thing to clean, and it takes a lot of money. Low. 99 Xu Fan is already considering future building maintenance costs.

"This involves the professional aspects of materials, you can communicate with them!

"Well, keep in touch, it's better to be able to get it out, and then let the building get wet from time to time, and it will automatically flush it, so that the cost of cleaning this part of the building will be saved!"

Xu Fan doesn't know if it can be done, but he can develop a special robot to summon it. The annual fee is still two million a year. Even if he can't get it out, he has to work hard for them. , but make them too busy.

"OK!

"Other things, just look at the design, the appearance is set like this, you are professional, I will not intervene too much, anyway, you are more scientific. 99

Xu Fan's request was almost finished, and after thinking that there was nothing else, he prepared a conclusion: "In the residential area, if possible, create some sky gardens, with the feeling of a garden, so you can live in that way. will be much more comfortable.

"It's almost like this. After the completion of 023, the design plan will be submitted immediately and go through the review process of the relevant departments. It is estimated that it will take some time. During the approval time, you should detail the internal design as soon as possible.

"Make a detailed plan for the construction part, construct it in sections, and try to be as extreme as possible. It is best to make data for each piece in combination with the actual situation of the construction team.

"For example, how many construction workers are invested in this piece, what kind of equipment is invested, how many days are required, how many materials are required, and what materials are required, all of which are digitized one by one."

"Squeeze the construction time to the limit as much as possible, and calculate the cost of construction, etc., so that we can go to the construction company to negotiate after the construction approval is passed. After all, it involves the construction of the building, and also our share. Sectional construction is very complicated!""

"With calculation and data refinement, you can save a lot of negotiation time. More importantly, there is cost calculation, which is directly placed on the negotiating table. The construction company can't be too big, let's add some profit and price it. , will not accept their business.""

Xu Fan now wants to shorten the construction time and save some money.

Although a lot of money is made, a deep-water port terminal project requires a lot of investment, and the money saved can be tilted as far as possible to speed up the process, so why not do it.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like