Refurbishment: Turning Waste into Treasure

Chapter 221 Complicated preparations [3 more]

The engineering contract is signed!

This does not mean that construction can be started immediately, and at least some preparations must be given to China Construction Group, such as dispatching construction personnel!

Even if people are dispatched, they can't settle in on a large scale. At least they need to choose a place in the surrounding area and build a temporary residence. They need to know that if there is no accident, when the construction reaches a certain level!

The headquarters building of the Bluestar Second-hand Trading Group will have more than 5,000 construction workers at the most. Just arranging the accommodation for so many people is a long-standing problem, and even the surrounding area cannot accommodate it.

Fortunately, China Construction Group has a branch in Shennan City, that is, the Eighth Bureau of China Construction in Shennan City. In the Ping'an Building, as well as the railway project, there are not many dispatches nearby.

"The old building needs to be blasted at a fixed point, and then cleaned up, especially the surrounding area, which will take a certain amount of time!"

Zhang San has his expectations, and it is also good to tell the boss, there are certain variables in the middle: "At the same time, some of the building materials we need to provide need to be shipped, and this aspect must be handled by us. 99

"We are also responsible for the construction of the mixing station. China Construction Group needs to do these preparations. We also have a lot of preparations to do. Only after both parties are ready, can the construction officially start. "Zhang San couldn't explain it in one breath.

"I know all this!"

It's not that Xu Fan has not seen the construction site, and he knows the construction steps: "When we first started digging the foundation, we still relied on machinery. After they cleaned up and the machinery settled in, we only prepared it. I think we have enough time. of."

"After all, we need to excavate the foundation, but if we need to dig more than 20 meters underground, it will take a certain amount of time to dig this deep." Xu Fan has listened to Sun Xiaoshi's model explanation and firmly remembered some of them. key data.

"If there is no accident, it looks like it is hollowed out to a height of 23 meters, and 8 excavators can work at the same time. The difficulty is that the more you dig, the more difficult the excavator work. After all, when the ground reaches a certain depth, there will be groundwater. , If there is too much groundwater, the pump cannot be drained in the first time, and the operation has to be suspended.

What Zhang San talks about are all objective factors, but these things are unavoidable during construction, and it is not a big problem: "Then I will start some of our preparatory work here?"

"Let's start, don't let them wait for us, and, after the purchase of the building materials for the headquarters building is completed, notify me as soon as possible."

Xu Fan nodded, he didn't want to delay the construction period because the preparations here were not done well: "Let Lin Dashan take charge of this matter. He shouldn't show his face now. It's the most suitable for him to be in charge of these two projects."

"Okay, boss! 35

"Also, during the construction of the headquarters building, it is necessary to communicate well with all parties. Shennan City is a city that has developed later. Although many plans are still insufficient, it is already very good. There are many facilities in the underground. .

Xu Fan said here, paused for a moment, and then continued: "If I remember correctly, there is a relatively large subway station not far from Shennan Avenue, which requires contact with the Shenzhen Railway Group. Let's see if it will affect it, although it won't, don't start the work, they will run over and stop it, then the trouble will be big.

"Besides, there are the electric power department and the telecommunications department, who should contact them one by one, keep in touch with them, and see if they have buried facilities in the ground. If there are, it will also affect them, and let them come over and relocate immediately. , All these small factors that may be affected will be removed to ensure the smooth progress of the construction.

"Then there is the construction material that we need to prepare, the size and so on cannot be the same, after all, it is scrapped steel, after the renovation, the head and tail have to be cut off. This is waste, so when preparing the original material, it is necessary to do everything If possible, prepare a little more, so as not to be insufficient when the time comes, and you will waste time.”

Xu Fan would rather prepare more and cause waste than waste time because of lack of materials, because those were originally purchased scrap copper and rotten iron, and they are really not worth a lot of money, and more money is not worth much.

"The original plan was to prepare ten percent more, so add ten percent?"

"Yes, a full 20% more is enough!"

Xu Fan nodded before proceeding to the next step: "The place where the scrapped materials are piled up, a temporary work shed should be built, which is enclosed."

"It's already under construction. A temporary workshop is built. It's very big, and some cutting equipment will be purchased. At that time, a team member who participated in the design will be sent over to take charge of cutting and processing the raw materials!

・・・・Seeking flowers 0....

In fact, many of Zhang San's preparatory work has already been carried out earlier, and everything can't be started until the boss gives an order, that is his incompetence as a general manager: "It's a bit troublesome for this batching plant, at least it belongs to the deep-water port project. The construction of the project, foundation leveling and so on, are all in charge of the China Construction Group.

"It's the equipment of the stirrer. It has been purchased and ready. It only needs to be refurbished, and the foundation and infrastructure are built. The equipment can be transported and installed, and then opened!" Zhang Sanru said.

"That's fine. If there is a need, it's not impossible to renovate it in advance!""

0.....0

Xu Fan knew that because he wanted to save money, he made a lot of things himself, and bought scrap or old equipment, which had to go through his hands: "Well, if necessary, you can sort it out, and then the time comes. Those urgently needed items can be refurbished first, and it is not necessary to wait until everything is ready and then refurbish the whole batch.

"OK!

"Then, let's do it first!"

Xu Fan waved his hand, and the matter about the work of the headquarters building ended here, and then he asked, "In terms of medical equipment, have you encountered any problems? 99

"There is no problem, but the progress is a little slow!

Zhang San answered truthfully, hesitated for a moment as if he was organizing language, and then said: "Medical equipment seems to be in huge market demand, but the situation in our country is also a bit different, and it is not enough to go to the door to sell it directly. This is different from various medical institutions. The person in charge still has a certain relationship.”

"Some people seek stability, while others are procrastinating as long as they can, or they want to reach out for benefits. There are all kinds of factors, and the progress is slow!"

"In addition, there is another factor, that is, if you want to add new equipment, you need to report to the upper level for approval. Only after getting the approval, the lower level can operate." Zhang San left this difficulty. Said at the end.

Hearing this, Xu Fan couldn't help frowning. He had thought of many issues, but there were also many issues that he had not considered.

He needs to think about how to break the game.

five.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like