The Engineering Boss

Chapter 104 Poured retaining wall with commercial mix

Landslide rescue project construction site.

Passing vehicles are scheduled to pass from 9:00 am to 12:00 noon and from 3:00 pm to 6:00 pm every day, and there are traffic police on the scene to direct the release.

After Chen Yang came to the temporary residence, he handed over a blueprint to the junior administrator, and then the two came to the landslide construction site.

The junior administrator pointed out to Chen Yang the starting point of the retaining wall that was designed on site yesterday, and then pulled eighty-five from the starting point to one side to find the position of the retaining wall.

The foundation of the designed retaining wall is one meter below the original road surface, that is, it needs to be dug down by one meter. As for the base width of the retaining wall is 2.5 meters, the slope ratio of the retaining wall is 1:0.3, and the slope ratio of the foundation is 1. :10.

There is a drainage ditch about 50 centimeters above the foundation of the retaining wall, and inside the drainage ditch is the retaining wall, which should be as high as 4.5 meters from the road.

"Now that the design drawings are out, we also know what to do. Tomorrow, you should quickly arrange for the excavator to excavate the foundation of the retaining wall. Excavate in sections according to the instructions given in the design. Put it in the spoil yard, and if it needs to be backfilled, it can be pulled back and backfilled." Chen Yang looked at the arrangement at the scene.

The junior worker responded: "Well, good boss! Tomorrow I will excavate a section every ten meters, try to excavate it in one day, and then arrange personnel to support the formwork."

"There are definitely not enough workers to pour the concrete. It's easy to find workers now, but the materials are a little troublesome. I will contact the sand and gravel materials tomorrow. If you have finished digging here, I may not be finished there."

The junior administrator next to him felt a little troubled when he heard the boss's words, and thought why the boss didn't use business to mess around, wouldn't it be more convenient, and the workers didn't have to look for so many.

"Boss, I have a suggestion, do you think it works?"

"Say it!"

"Boss, this project is trying to rush the construction period while focusing on the quality, so that the traffic can return to normal. If we use our own mixing to pour the concrete for the retaining wall, this will only greatly increase our construction time."

Makes sense!

"So I suggest to the boss that you use commercial concrete to pour concrete for the retaining wall, so that as soon as the formwork is set up, contact the commercial concrete and you can pour it directly, without waiting at all."

Business mix!

That's right, why didn't I think of a businessman!

If you use a commercial mixer, you don't need to buy a large mixer and install it, and you don't need to buy materials such as sand, gravel, cement, etc. You only need to rent steel formwork steel pipes, which saves a lot of trouble.

And as far as I feel that these few workers are enough, I finally ask a few small workers to help. All in all, using commercial mixing is a good choice.

"Your suggestion is good, otherwise I will do something stupid again!" Chen Yang smiled, "Tomorrow you dig out the foundation of the retaining wall, and I will get back the steel formwork and steel pipes. As long as the foundation of the retaining wall is dug out, immediately Once the formwork is set up, the concrete will be poured after the steel formwork is set up.”

"By the way, do we have enough workers now? Do we need to hire some small workers to help?"

The junior worker thought for a while and said: "Maybe we need to ask a few small workers to help. At that time, our workers will do their best to support the formwork, and the small workers will be responsible for delivering the steel pipe formwork. This may be faster."

Hearing this, Chen Yang immediately took out his mobile phone and searched for the number of the uncle that day, and dialed immediately after finding his number.

After the call was connected, he told the other party that he needed workers on the construction site. After hearing this, the other party said that he would come to the temporary residence built by Chen Yang immediately.

Soon the uncle came slowly on a motorcycle, but there was a middle-aged woman sitting behind him, probably the uncle's wife.

"Uncle, we may need a few small workers when we block the wall and support the formwork. At that time, you may need to find a few small workers to help."

The uncle said: "I don't know how many small workers are needed? How much do you pay for a day?"

"My small worker here is paid 120 yuan a day,

You are people nearby, I can provide you with a meal at noon. As for how many people are needed, it is enough to add you to find four more small workers. "Chen Yang said.

The uncle didn't have any objection after hearing Chen Yang's wages, and he was quite satisfied with Chen Yang's offer of a meal at noon.

"How long can you work here?" the uncle asked.

How long it will take is hard to say!

Chen Yang could only tell the uncle that he might have to do it for more than a month, and it would not end until the Chinese New Year. The uncle was very happy after hearing this.

If I can work here for a full month, in my uncle's opinion, this year should be very good, because I can earn several thousand yuan in this month.

Chen Yang sent the uncle away, and he drove back to the county.

On January 8, at 8:30 in the morning, at the Hongtao Rental Station in the suburb of Ninghui County.

On the way back to the county yesterday, Chen Yang saw several rental stations on the side of the road. He wanted to rent the steel pipes and steel formwork yesterday, but he thought that there was no car to pull them, so he had to wait until Hu Xiaojun came to pull them today.

Chen Yang rented a large amount this time, so the owner of the rental station was very enthusiastic after learning about it, and tried his best to hold Chen Yang to rent the steel pipes and steel formwork from his house.

After some bargaining, Chen Yang rented steel pipes at 0.01 yuan per meter per day, fasteners at 0.005 yuan per day per day, and steel formwork at 0.2 yuan per square meter per day.

The specific time of the rental has not been determined, but Chen Yang paid 2,000 yuan in advance to the rental station, and will calculate it carefully when he returns after the project is completed.

Hu Xiaojun finally arrived at the Hongtao rental station at ten past nine o'clock. With the help of the Hongtao rental station, Hu Xiaojun slowly drove a car of steel pipes and steel formwork towards the emergency project site.

It was already eleven o'clock in the morning when Chen Yang and Hu Xiaojun came to the scene, and the three excavators and one loader were busy.

"Brother Chen, the foundation of this retaining wall was dug very quickly!"

At the rental station, Chen Yang told Hu Xiaojun what he was doing on the construction site today, so he knew what was going on at the scene at a glance.

"I arranged for them to dig out the foundation of the retaining wall today, and start formwork tomorrow!"

Wait, I wonder if the foundation of the retaining wall needs to be accepted?

Thinking of this, Chen Yang immediately called Zhou Xinjin, because Zhou Xinjin was in touch with these matters, and he was only responsible for doing things on the construction site well.

Soon Chen Yang ended the call with Zhou Xinjin, and during the phone call, Chen Yang learned that the higher-ups were going to send someone to check and accept the foundation of the retaining wall.

Chen Yang thought to himself, since the higher-ups wanted to send people down to check and accept the foundation of the retaining wall, he had to arrange for someone to dig the foundation of the retaining wall and clean it up immediately. Prepare well and strive for one-time acceptance.

At this moment, Chen Yang saw Village Chief Liu slowly approaching him on a motorcycle, and stopped immediately when he came in front of Chen Yang:

"Boss Chen, is the excavator free these days?"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like