The Engineering Boss

Chapter 588 Celebrate

At around 2 o'clock in the afternoon, Chen Yang and Hu Xiaojun came to the project department of Gaochang Expressway.

Originally, Chen Yang planned to go to the project department of the National Railway No. Then he went to the project department of the National Railway First Bureau to talk to Jiang Qiao about the matter.

When he came to the project department, most of the management personnel had gone to the construction site at this time. Chen Yang called the middle-level administrator in advance and told him to wait for him in the project department.

At this moment, the middle-level administrator is waiting for Chen Yang's arrival in the office of the project department.

Chen Yang walked into the office and first asked the middle-level data clerk: "How much work did we do last month? And did you ask, when will the National Railway First Bureau allocate the project funds?"

"Boss, last month we did more than 16 million engineering quantities, but when we handed over the materials to the supervisor for review, they cut off more than one million yuan, saying that some of our engineering quantities were not counted for the time being."

For now?

It means that this part of the project should also be counted.

"When did the supervisor say that this part of the project will be calculated?" Chen Yang asked.

"They didn't say the specific time, they just said that they need to ask the owner some questions before they can determine when to measure." The intermediate data officer replied.

Chen Yang heard the words and looked at the middle-level administrators: "Are we paying them benefits on time every month for the supervisors?"

"Yes, it is posted on time every month. Even if we forget before that time, the supervisors will remind us on time, so it is impossible to miss it." The middle-level administrator replied, "It can be said that these supervisors were We were fed fat and fat, otherwise the construction site would not dare to take care of us like this."

"Boss Gao and Boss Huang in the first and second paragraphs are asking us how much money we paid to the supervisor, but they are not strict with us. How can we tell them this kind of thing? Every time we ask them, we can only laugh without saying a word. On the other hand, they will be issued rectification notices by the supervisor every three to five times, and they will even be fined."

Although Chen Yang seldom dealt with supervisors, he arranged for people from the project department to invite supervisors to have a meal every half a month. Supervisors take good care of those who are comfortable.

Moreover, Chen Yangguang paid tens of thousands of salaries to the supervisors every month. As the saying goes, people are soft-spoken and short-handed. Since they have received Chen Yang's money, they have to do things for Chen Yang.

If his own workers were doing the work, then Chen Yang would not take care of the supervisor like this at all, because Chen Yang believed that the work done by his workers would not have any major problems at all.

But now the people working in Chen Yang's hands are hired by some bosses to bring a group of workers to do it, so the quality of the work is a bit worrying.

If the supervisor is not "served" well, then I am afraid that there will be problems on the construction site all day long, and the supervisor will ask for rectification all day long, just like Boss Gao and Boss Huang.

"Don't worry about the two big bosses, they just don't tell the truth when they ask. I don't think they will tell the truth to them if they are supervisors. It's best for everyone to be bored with this kind of thing." Chen Yang said, "In fact, everyone It’s clear, I just don’t want to expose it.”

The middle-level administrator nodded upon hearing the words, and only fools are willing to pierce it. If they pierce it, wouldn't they be asking for trouble?

"By the way, boss, a bridge will be built in a few days, and a tunnel will be completed soon. People below have reported that the bridge is completed or the tunnel is completed. Shouldn't it be celebrated?" Middle-level management The member suddenly spoke. Si minus bXW X.C o Si

Um?

There is a bridge repaired!

There's a tunnel running through!

celebrate?

Boss Zeng was contracted to build six bridges. After so long, none of the bridges were built for him!

Now that the construction is finally completed, the remaining five bridges will be coming soon!

Because Boss Zeng started the construction of the six bridges at the same time, as long as one is completed, the rest will be completed soon.

The same is true for tunnels, as long as one tunnel runs through, the rest of the tunnels will be very fast.

"How do they want to celebrate?" Chen Yang asked.

This kind of thing should really be celebrated. Many construction sites like to hold this kind of celebration, so that the workers on the construction site can be more active and the atmosphere can be more harmonious.

"Many people suggested buying a sheep or two to have a good meal. I think this is a good idea!" the mid-level administrator laughed.

Buying sheep to celebrate?

One sheep costs one or two thousand yuan, and buying two or three sheep costs four to five thousand yuan at most, which is enough for people on the construction site to have a good meal.

If all the workers on the construction site were brought to a restaurant to celebrate, four to five thousand yuan might not be enough.

However, there are four to five hundred workers on his construction site. If everyone has to eat a bite of mutton, how can one or two sheep be enough? I don't know if ten sheep are enough.

"There are so many workers on our construction site, one or two sheep is definitely not enough. In this way, if you go down and buy ten sheep, Ma Gang and Ma Tao have the most workers there, and four sheep should be enough for them; Boss Zeng There are three sheep there; Boss Zhou has two sheep, and our project department has one sheep.”

"Directly lead the live sheep to them and let them do it themselves. After all, everyone has different tastes! And no one is obligated to do it for anyone, let alone our project department."

"And these ten sheep cost less than 20,000 yuan, and my boss is still willing to give up the money."

The middle-level pipe worker smiled and said, "Okay, boss, I'll ask the surrounding villagers which house has so many sheep, and book there first."

"Wait, since this little money has been spent, then the boss is in 'how' so a little bit, you go down and order a hundred pieces of beer, and distribute them to them in a ratio of four to three to two to one, with mutton If there is no wine, it will taste a little bad, so I'd better prepare wine for them. "

"As for cigarettes, which cost ten yuan per person and a pack of cigarettes, the project department should have the exact number of workers on the construction site. When you come down, you can buy them according to the number of workers recorded by the project department!" Xiru 9duxs.com Xiru

Anyway, these things don't add up to much money, so Chen Yang is willing to eat this little money.

"Boss, some workers don't smoke or drink, such..."

"Don't worry about these. Send them directly to their bosses. How much is left is their business. We just send it."

Chen Yang didn't think it was necessary to be so fussy, wouldn't it be a bit more grandiose to be so arrogant? Mi He Mi

Some workers don't drink beer, but some people don't just drink one or two bottles of beer, and there are many people who drink half a bottle. Chen Yang is afraid that the beer given to them is not enough.

Anyway, they were trying to find a way to drink enough, so Chen Yang only provided them with this little wine.

"Then boss, are you coming to celebrate that day?"

If you like engineering masters, please collect them: () Engineering masters update the fastest.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like