Chapter 33

On the evening of the 12th, Ying Ziyue walked home from the Special Research Institute this time.

At six o’clock, it was still dark.

Walking on the bustling Yanjing street, some pedestrians were muttering curiously.

“Recently, the weather has become more and more weird, the sunshine time has decreased, the weather has become more and more sultry, and it is uncomfortable to wear clothes. I heard that it is impossible to observe the moon now.”

“Yes, now I heard that even the plateau cities are getting dark at 8 o’clock. That’s Daozi City. It used to be dark at 9:30. Now the direct sunshine time is one and a half hours late, and the weather is getting worse and worse. The more things are wrong.”

The two young men smiled bitterly and shook their heads and walked by.


There are a lot of people, not just them, Ying Ziyue seems to be a ghost, watching the people’s prediction of the next.

He stood at the door of a shopping mall casually, with the cold air of the air-conditioning inside the door, which was extremely comfortable.

It was sweltering natural weather outside the door, and many girls were muttering after someone walked out.

“It’s too hot, it’s getting dark fast, and it’s getting hot fast, maybe it’s really going to be the end of the world.”

“Fuck you, it’s the weather.”



Several girls were laughing and joking.

clatter.

Ying Ziyue walked by again until he got home at 8:30.

Parents are still busy at work, Ying Ziyue makes some meals at will.

Recently, he hasn’t gone to the Civil Engineering University for a long time. Before Ying Ziyue asked for a hypothesis and studied abroad for a period of time, now he opens the discussion group created by the school at will.(Read more @ wuxiax.com)

The message is still 99+

As a well-known civil engineering building and infrastructure university in the country, this school knows more of the country’s large-scale projects.

For example, at this moment, the current discussion group and academic departments of all departments are discussing a new topic.

Because Yenching started laying train tracks, Yenching University of Civil Engineering and Architecture also received a new large-scale project forecast, which was a large-scale project notified by the Special Research Institute.

At this moment, there was some explosion in the discussion group.

[3 Department-Surveying Department Ma Kangan]: What do you say is the million-scale railway station that the principal said last time? Is it possible to build a million-scale train station, abandon the trains of all provinces across the country, build one million train stations, one ten million train stations, and our survey department has a new task, and we have to survey and map every next one. The scale of the city seems not only to start construction on trains, but also to start construction on the city! ! !

[1 Series-Infrastructure Studies Jiang Zhean]: Your survey department is okay. Our infrastructure department is under great pressure. A million-scale train station is built in Yanjing, among which ten million-scale train stations are built in the south and north as factory transportation stations. , There is also a vegetable, agricultural and food transportation station. I can tell you that once the train can be started, these three railway stations can transport vegetables and construction materials across the country, and even the highways on the provincial roads can be cancelled!

[3 Department-Engineering Design Ma Peipei]: Let alone this train station is about to start anyway. By the way, are there any students studying abroad? I remember the former schoolmaster Chen Shuai went, and he said that foreign countries are much better than domestic ones. are you back? ”

[1 Department-Civil Engineering Qin Jie]: Previously, the country called on overseas students to return. This guy has been delayed because of a delay. Now he has closed the country. This guy seems to have smelled a major project in our country and is now looking for the principal to return. ”

clatter.

After closing the group, Ying Ziyue leaned against the floor-to-ceiling window in the bedroom, and a smile appeared on the corner of Ying Ziyue’s mouth.

He had asked the official to gradually mention the super train station plan before, and now it is about to start.

The laying of train tracks circling the country,

The first station of Yanjing, one million train station was built.

However, it’s the construction of special energy trains,

The last is to run, the Snow Country Train mission is completed.

It’s all started.

The long dark night came gradually, Ying Ziyue opened the window, there was no wind, there was only sultry weather, and the radio on the bedside continued to broadcast.

[Beiglacier-15, the world’s largest glacier, has now melted three-fifths, and it is not ruled out that accelerated melting may cause a tsunami in coastal cities][Starting from July 2nd, the global temperature has continued to increase. The average temperature in the East is currently 37 and a half degrees. It is currently increasing. Meteorological experts recommend preparing for heatstroke prevention and minimizing going out.]

clatter.

Then came the noise of the radio. This is Yingfu’s collection, an old-fashioned radio.

In the old days, Ying Ziyue also listened to this radio and watched disasters one by one, and each giant city was frozen by ice.

It’s the same now.

From the surface, the traces of the disaster became more and more obvious.



At the balcony, Ying Ziyue took a pen and wrote lightly on a piece of scratch paper.

——The Long Knife is the Snow Country Train, and the Great Shield is the Wind and Snow Link City. More than one billion people work hard together! .

Read more @ wuxiax.com. Chinese MTL Fan-Fiction/Second Element novel can be read @ HotMTLNovel for free.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like